TUNNEL FORM CONSTRUCTION AND SPEED

The speed of project completion with the tunnel form system is simply phenomenal and unmatched. In its simplest calculation each set of tunnel form can complete a minimum of 350m2 and maximum 500m2 floor plan a day. In a 24 day month (allowing time off and down time for the batching plant logistics etc) that is 24 x 350m2/500m2 of floor plan area per month. That’s 8,400 m2 to 12,000m2 of the total project built floor plan area completed per month.

As an example our Bahcen Eryaman project of 10 apartment blocks G + 13 floors with a total project floor area of 12,000m2 was completed in just 6 months with two half sets of formwork, two crews and two tower cranes

 

https://www.youtube.com/watch?v=-5iRfRY2jnU

 

Interesting this was the second of three similar projects completed with the same tunnel form sets also adapted from project to new project Another ROI on initial investment as formwork costs is amortized over 3 project costs.

Thus this is why project success is guaranteed with tunnel form.